Winter Park, Florida · Serving agencies nationwide 407-951-2117 Email us
The Center for Public Safety Research & Planning

Home › Seminar

Professional education

The Public Safety Facilities Planning Seminar

A working session for city and county administrators, police and fire chiefs, emergency management directors, facilities staff, and the project management staff who will actually carry a facility project, covering how these projects are planned, funded, and built.

Next session Registration open

March 11 and 12, 2027 · Orlando, Florida

Two days on how a public safety facility project is planned, funded, procured, designed, and built, presented by The Center for Public Safety together with Architects Design Group. Registration is limited to current city or county employees.

Dates
March 11 and 12, 2027
Location
Orlando, Florida
Early registration
$395 per attendee through February 11, 2027
Standard registration
$450 per attendee from February 12, 2027
Lodging
A list of area hotels is sent with your confirmation
Register for the March Session

Most Agencies Build Once in a Career.

A chief may spend thirty years in the profession and be responsible for exactly one building. There is no opportunity to learn this by repetition, and the consequences of the early decisions, which are made before anyone with construction experience is involved, persist for the life of the facility.

The seminar exists to close that gap. It walks through the full arc of a public safety facility project, from recognizing that a building is failing its organization, through programming, funding, procurement, design, and construction, to occupancy. It is built around what actually goes wrong, and when.

The decisions that set the cost of a building are made in the first few months, by people who have never built one before.
Chart of public safety facility project phases, from pre-design planning through design, bidding, construction, commissioning and post-construction services
The arc the seminar follows, from notice to proceed through the warranty inspection eleven months after substantial completion.

Curriculum

What the Session Covers

Four parts, running in the order a real project runs. Each one is built around what actually goes wrong at that stage, and when.

PART ONE

Establishing the Need

How to document that a facility is inadequate in terms a governing body will accept. Space needs assessment, the relationship between staffing projections and building size, and the difference between a deficiency and a preference.

PART TWO

Funding the Project

The realistic funding paths for public safety construction: bonds and referenda, grant programs, certificates of obligation, impact fees, and phased approaches. What each requires, how long each takes, and which combinations actually work.

PART THREE

Procurement and the Design Team

Delivery methods and their consequences, writing an RFQ that produces comparable responses, evaluating and selecting a design team, and structuring the owner’s role so it does not collapse onto one already-busy person.

PART FOUR

Design, Construction, Occupancy

Where projects go wrong: scope drift, the change order cycle, and the operational details that are value-engineered out and cannot be recovered. The session also covers the transition into a live building without interrupting service.

Faculty

Who Teaches It

The seminar is presented jointly by The Center for Public Safety and Architects Design Group, so the planning side and the design side of a facility project are in the room together. Peer speakers from agencies that have been through a project are announced during the session.

Stockton Reeves

Executive Director, The Center for Public Safety. Leads the firm’s space needs, staffing, and funding work, and serves as principal-in-charge on its engagements.

Ian Reeves, AIA, IALEP

President, Architects Design Group. Brings the architectural side of public safety facility delivery, from programming through construction administration.

Rodney McManus, LEED AP

Senior Vice President, Architects Design Group. Covers sustainable facilities and the construction process as it is actually experienced by an owner.

Sami Gerwick, RA

Associate Vice President, Architects Design Group. Covers interior design, security, and the operational detail that decides whether a finished building works.

Who attends

Built for the Whole Project Team, Not Only the Chief.

City and county administrators, police chiefs, fire chiefs, emergency management directors, facilities department representatives, and the project management staff who will carry the work day to day. Registration is limited to current city or county employees.

The most productive attendance is a group from the same jurisdiction. A great deal of the difficulty in facility projects comes from the chief, the manager, and the finance director holding different and unexamined assumptions about what is being proposed. A shared day tends to surface that early, which is the cheapest moment to surface it.

Register for March 2027

Registration

Spring 2027 in Orlando

Registration for the March session is open now. Early registration is $395 per attendee through February 11, 2027, and $450 per attendee from February 12 onward. Attendance is limited to current city or county employees, and a list of area hotels is sent once a registration is confirmed.

Sessions can also be delivered on site for a single agency, a county, or a regional association. If a private session would suit your jurisdiction better, get in touch and we will put dates to it.